PROJECT INFORMATION
Does the project include HVAC/mechanical work?:
Yes
Does the project include electrical work?:
Yes
Does the project include plumbing work?:
Yes
Does the project include fire sprinkler system work?:
Yes
Value of improvements / contract cost (determines fees and base number of inspections included):
165500
Type of construction:
2B (602.2)
Actual building height:
58
Number of stories:
4
Total area of building footprint (not just tenant space):
170000
Floor area included in scope of work:
5402
Number of buildings:
1
USE AND OCCUPANCY
Primary use group:
A-2 (303.1)
Occupant load of the building / addition / remodeled space based on Table 1004.1.2:
96
FIRE PROTECTION
Is fire suppression required?:
Required
Will the building be equipped with an automatic fire suppression system, and if so, will coverage be full or partial?:
Full
Will the fire suppression system be wet or dry?:
Wet
Will the building be equipped with a fire alarm system? (907):
Yes
Will the building be equipped with a smoke detection system or smoke alarms?:
Yes
ENERGY CONSERV-SUSTAINABILITY
Do all New Buildings comply with all relevant provisions?:
No
Do all Additions comply with all relevant provisions?:
No
Does all Equipment comply with all relevant provisions?:
Yes
Will the project comply with a recognized standard for sustainability?:
None
PROPOSED USE
LOCATION
Zone District:
SD-IT
Zone Neighborhood Class:
TN
Historic District:
Not Historic
Ward:
2
Neighborhood:
Midtown
Inspector Area:
CENTRAL