PERMIT TYPE
Following construction, what is the intended use of the site?:
Mixed Use
What is the current (former) use of the site?:
Industrial
Will a new building or parking lot be constructed, or the footprint of an existing building or parking lot be modified?:
No
Will the site stormwater drainage system (including on-site retention, treatment, etc.) be modified?:
No
Will there be excavating or grading?:
No
Will any sidewalk, drive approach, or curb/gutter be constructed or replaced in the City right-of-way?:
No
Will temporary closure of sidewalk, parking lane, or travel lane(s) in the City right-of-way be needed for staging, safety, or other?:
No
Will there be an ongoing encroachment of "permanent" features into the City right-of-way (e.g., awning, sign, wall)?:
No
Has the project been formally approved IN WRITING (resolution or approval letter) and by whom?:
Not Approved
PROJECT INFORMATION
Expected construction commencement date:
10/10/2023
Expected construction completion date:
10/10/2024
What is the total size of the project IN ACRES?:
1.8
LOT INFORMATION
Lot Frontage:
400
Lot Depth:
278
Lot Area:
74052
Lot Shape:
Irregular
PROJECT SUMMARY
Construction of a new building:
Yes
Expansion of an existing building:
No
New/expanded use of an existing building:
No
Demolition of an existing building:
Yes
Increase in residential density:
Yes
Construction of a new parking area:
Yes
Expansion of an existing parking area:
No
Other:
No
ATTACHMENTS
Required plans message (this is a read-only message you must acknowledge by checking the box below):
After you review the application summary and submit your application, you will be prompted to upload plans and any necessary supporting documents.
Based upon your application, the following plan types will be required, which must be uploaded in PDF format:
Site Plan. Additionally, please provide these plan types if they are applicable: Landscape Plan | Lighting Plan. In addition to these plan types, any other submittal items necessary for the plans examiner to evaluate the proposed project should also be provided.
Check this box to acknowledge that you have read the above information about plan requirements:
Yes
STORMWATER CREDITS
Stormwater Credit Participant:
No
SIGNATURE
APPROVAL REQUIRED: I understand that submission of this application does not comprise approval of the permit or certificate being sought. I further understand that all information provided herein will be reviewed by the City before any approval of this application may be issued by the City. I understand that in addition to the information contained in this application, the City is authorized to review any public documents that may confirm the statements made herein, including proof of professional license status, construction documents/plans, records documenting proof of ownership, property history, or any other public record.:
JK
POSSIBLE PUBLIC HEARING: I understand that a public hearing may be required for some applications, with approval to be issued by an authorizing body, such as Board of Zoning Appeals, Planning Commission, or Historic Preservation Commission. I agree to refrain from undertaking any activity pursuant to this application unless/until approval is granted by the appropriate authorizing body, and the permit or certificate sought pursuant to this application is issued by the City.:
JK
APPLICATION FEE NON-REFUNDABLE: I acknowledge that any application or review fee is nonrefundable, whether my application is granted or denied.:
JK
SIGNATURE: I declare my intent to sign this application electronically pursuant to the provisions of the Michigan Uniform Electronic Transactions Act (UETA). I hereby sign this application by typing my full legal name into the box below.:
James Kilborn